2013/05/25

NBN: Coalition Fibre to the Node isn't pure-digital broadband, isn't secure, isn't meant to last

Not only is the Coalition's Fibre to the Node (FTTN) plan to share two mutually-interfering networks, over existing copper, more complex and expensive that it need be, it also flags they aren't designing it for longevity. Implicit in this design choice is "we're building it to throw away, soon." i.e. with a 10-15 year, or less, economic life.

The network design can never be optimum for either phone or digital/broadband, the combination is more complex, expensive and lower reliability than pure-digital and is missing two critical network design element: it doesn't follow the existing NBN design (standard device interfaces, end-end control & L2 Bitstreams) but ignores that engineering designs can only be optimised to for one thing.

2013/05/10

NBN: Coalition Fine Print - 1.1M houses WONT get 25Mbps.

When is a guarantee not a guarantee? When it's a Political statement.

The "minimum" guaranteed speed excludes one in seven (13%) premises covered by the Coalition's DSL-FTTN: or 1.1M premises will be "NOT happy, Mal!"

While the "target" is 10%, that's across all 11.3M fixed-lines, including the 24% premises served by Fibre. The 1.1M excepted premises will all come from the 8.968M premises covered by FTTN.

2013/04/15

NBN: Correcting the Record on the Coalition NBN Plan

This is a collection of Omissions, inaccuracies or misleading statement in the Coalition's NBN Policy documents.

Please Note:

  • The comments here are concise and assume a more technical knowledge than "an ordinary reader".
  • I'm NOT supporting either Political Party or their Policy.
    • Both Plans have deep, concerning issues.
    • Both side of Politics are making unfounded statements and questionable promises.
  • This piece is NOT analysis or recommendation for or against the Coalition Plan. It only seeks to layout facts that can be checked and confirmed on the public record.

2013/04/08

NBN: Turnbull pre-releases Policy to News Ltd, engages Full-FUD drive.

News Ltd is spruiking for the Coalition again, spreading Fear, Uncertainty and Doubt far and wide.

It's complete B/S for anyone, including NBN Co and Conroy, to say they know the exact project cost or completion schedule, either "on-time, on-budget" or a gross exaggeration of 2-3 times over budget, or even as Turnbull has been claiming, "it is a failing project".

I'm sorry, but "Failing projects" don't deliver anything, the NBN Co work is progressing and progressing well. The ALP and NBN Co are doing a lousy job of selling their performance and informing the public of their progress. MT would be right to criticise there.

2013/03/14

NBN: CommsDay vs ABC.

Media Watch pointed to the CommsDay "riposte" to the ABC's definitive article listing the issues around NBN. [Part 2 of article]. Written 14-march-2013.

Here's my analysis of Grahame Lynch's "50 problems". Commsday comments in this colour.
[18-Mar: Apologies to Grahame for misspelling his name]

For completeness, some disclosure: I don't work for, or hold shares in, a Telco, NBN Co or one of their suppliers or contractors, nor am I a member or supporter of any Political Party. Neither do I support the Labor NBN plan over the Coalition's unannounced NBN. I hold the position that either Policy with deliver better broadband access. My interest is for a clear and informed debate on what I consider the defining Technology of the 21st Century for national Business Productivity and Competitiveness.

2013/02/26

Unsolicited Advise to a classmate

I've never been a politician, managed a large budget or run even a moderate sized project, so why do I have the hubris to offer some unsolicited advice to a newly minted I.T. Minister, to whom by accident, I was once briefly a classmate?

Rejecting these thoughts "because nobody else is doing them" is an option, though not a great reason.

Rejecting them "because they're too expensive" is a judgement call, but has to be measured against "Compared to What?".
Doing nothing will cost you a whole bunch, you've already have the report on that.

The core arguments in support of my observations are:
  • How important to the current and future BackOffice and FrontOffice operations of your Government is I.T.? I suggest that the machinery of Government cannot operate without it I.T. systems, not simply ineffectively, but like airlines, not at all.
  • There is an internal consistency in what I propose, derived from one of the toughest businesses around. The challenge is not "will this work", but "how can it be made to work for us".

2012/11/26

NBN: The Economics of FTTH vs FTTN

Do you know a Bargain when you see one??
Is either NBN Policy proposal offering a bargain or the opposite, a "lemon"?

2012/11/07

NBN: FTTN in Australia - the Gungahlin Experiment

In 1995, Telstra announced that the new Town Centre in Northern Canberra, Gungahlin, would be a testbed for "broadband", with a $20-$30MM project announced laying "Fibre to the Kerb", which many people like me interpreted as "Fibre to the Home".

What Telstra deployed was RIM's, Remote Integrated Multiplexors, designed initially as an 'integrated' extension of the local Telephone Exchange. ADSL broadband was not supported. Instead of a world-class demonstration of the application and utility of fast broadband, Gungahlin residents were locked in a battle for even minimal access speeds.

For the rest of Australia, we have very clear demonstration of two things from this nearly two decade 'experiment':
  • Fibre-to-the-Node, even 15 years ago when it was a much, much cheaper technology than Fibre-to-the-Premises, is fraught for consumers.
    • Even when the subscribers thought they were out of the woods with high-speed ADSL 2+ available, the sting-in-the-tail of FTTN became apparent: congestion on the node "backhaul" makes line access rate irrelevant.
  • The Coalition, during the Howard government from 1996 to 2007, did not prioritise, nor apparently see the need for, a National Broadband Network.
    • It is only since the Telstra SSU agreements early 2012 that the Coalition has become committed to an NBN of any flavour.

2012/11/06

NBN: Costing the Coalition FTTN. It's not Good News.

Mr Turnbull, in his CommsDay address, seemed to be proposing the Paul Fletcher, "Wired Brown Land" FTTN:
  • 25Mbps guaranteed, VDSL2
  • 800m max wiring (approx. 500m road distance)
  • we can infer 40-60 subs per node, consistent with the 160 subs/node of the first Telstra FTTN.
  • The "golden screwdriver" is "Multi-Service Nodes": field upgradable from copper to Fibre.
So, what's it going to cost to roll this out to 12M subs, the 93% of premises addressed by NBN Co?

Will Mr Turnbull achieve the Coalition tagline, "Better Broadband, Cheaper, Sooner, More Affordable"?